About Us  Support Material  Students Work  Careers Advice  Former Pupils  Links

This is a list of dates and lesson content for all Year 8 classes in both Electronics and Product Design/Graphics. Pupils are timetabled for 2 lessons per week and swap groups approximately half way through the academic year.

Week

Year 8 Elect

Year 8 Graphics

1   5-9-07 to  7-9-07

Component recognition use of Croc Clips.

Using 2D - Design – revision.  2D representation of boxes. Convert to 3D view

2   10-9-07 to 14-9-07

Understand the function of the devices. Cells and batteries

Isometric and \Oblique views of boxes and objects.

3   17-9-07 to 21-9-07

Range of components / SENSORS, capacitors.

Addition of colours. Shading / use of colours.

4   24-9-07 to 28-9-07

Test 1 Types of switches / circuits.  Relay

Test 1 Use of drawing board – setting out of 3D drawings

5  1-10-07 to 5-10-07

Transistors as a switch. Identification of connections. Current amplifier.

Views of the wooden blocks in Isometric and Oblique.

6 8-10-07 to 12-10-07

 

 

Grades due Thursday 11th. Oct

Fire Alarm Circuit/ one transistor circuit – Darlington Pair.

Grades due Thursday 11th. Oct

Workshop – Health & Safety  Issues. Use of the Marking out tools. Using the tenon saw and bench – hook.

7  15-10-07to 19-11-07

 Half – Term next fortnight

Light and Darkness sensing circuits.

Use of the vice to hold the work. Use of the chisels and planes.  Shaping a piece of wood. Pillar Drill, sanding

8  5-11-07 to 9-11-07

Moisture sensing circuits

Rain detector.

Project 1 – towel holder using softwood and a marble.

9  12-11-07 to 16-11-07

Test 2 Latching circuits using a thyristor. applications.

Test 2Completion of making project

10  19-11-07 to  23-11-07

Project Outline.

Development of a brief Research Process. Planning  Project choice and Research – circuits

Documentation of Project  and introduction to the laser cutter.

Using the laser cutter.

11 26-11-07 to 30-11-07

Grades due Thursday 29th. Nov

Revision of Work during the Term

Grades due Thursday 29th. Nov

Revision of Work during the Term

12  3-12-07   to 7-12-07

Mid Year Assessments

 

Mid Year Assessments

13 10-12-07 to 14-12-07

Construction of the Project and Preps producing the document

Design a post – it  holder using  2D Design and cut out using the laser cutter and assemble and finish.

14 17-12-07 to 19-12-07

Production of the pcb and casing.

Cutting out and assembly.

  Christmas Holidays

 

 

 

Completion of the Project and documentation. Change groups

Documentation

Change groups

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Back ] Home ] Up ] Next ]

Up
Year 7
Year 8
Year 9
Year 10
Year 11
AS Product Design
A2 Product Design
A2 Electronics